Experienced Sawyers
Victoria Wide
Certified Timber Graders
PRICING
Get in touch to disccuss whats best for your job
Base
$150
/Per Hour Plus GST
Lucas Mill And Operator
Base + Excavator
$200
/Per Hour Plus GST
3.5t Or 9.5t Excavator
Most popular
Woodmizer + Excavator
$270
/Per Hour Plus GST
LT50 Bandsaw With Excvator
Premium
$320
/Per Hour Plus GST
Lucas and Woodmizer Mill. With an excavator and 3 Operators
We Are Based In Lilydale Vic.Float charges do apply when bringing more than just a Mill.Happy to travel statewide, we do go interstate for the right jobs.




Milling capability
For our On-site work we use a Lucas mill 10-30
For Dimensional Cutting:
We can do any size between 250mm high and 500mm wide
Ideally we keep it below or at 250x250 as it's a more efficient cut.
We can go out to 7 meters in length but keeping cuts straight can become difficult.
Ideally we cut 5.4 meter barrels and below. There fast to load into the mill and provide good options if you'd like to break the length down further later.
We can change the dimension of the cut at certain stages of log processing, we will work with you to put together a cut list.
For Slabbing
We can slab a log out to 1.25 meters wide and 160 mm thick.
Note: For customers considering a combination of slabs and lumbar just keep in mind it does take to 10/15 minutes to alter the mill for the different cut.
Milling In Action!
Click the Below Video To See Our process
LoG Prepration/Storage
If you are not quite ready to book us in, but wondering how to preserve your timber to prevent decay and maximise yield.
The main thing is to paint the ends of your logs, there is a specialised end grain sealer.
I wouldn't stress too much about that for 1 off uses. House paint will suffice.
If you are bucking logs yourself, allow a few hundred mm extra, this is for wastage in end splits
If possible when stacking the logs for storage, try keeping them off the ground.
What We need From You
When we come out your logs, theres a couple things that make our life a heap easier.
Water avaliable-We use water on our blades,we can bring it with us. But if possible a tap is ideal, we bring 50 meters of hose with us.
Space-The Mill has a footprint of about 7 meters by 3 meters, if flat grounds avalaible to work on we do make an effort to set up in that location and bring the logs to the mill. Sometimes flat is just out of the question, we can work on some wild angles if needed.
Vehicle access is also obviously nice, but sometimes it unavailable. We can walk the mill in if necessary.
Using Your Timber
We arrange your timber for drying as it comes off the mill.
This is done with sticks between the rows of cut timber to maximise air flow.
We also band the packs with metal straps to limit movment as it drys.
Our Sawyer will consult with you on site regarding the size of the packs youd like.
Ideally for long term storage, keeping your packs in a place out of direct sunlight and with good airflow.
Tin and shade cloth works as well.
Drying time for slabs as a general rule takes 2 summers to get them to a low & stable moisture content level.
Some movement in drying is to be expected, we cut them well oversize to account for this.
Drying For Dimensional Timber varies on the size of the piece, and how you'er going to use it.
If you'd like us to grade your timber so that it can be used for building purposes (Ie:F17) we can do so as it comes out of the mill but the rating we can give it will be far lower than if we come back and grade it 12 months after it was cut.
In grading this is called seasoned and Unseasoned.
Once your timber is dry we can help you to get it dressed if needed.
Notes
We are based in Mount Evelyn Victoria. We will travel pretty much anywhere, but at certain distances we have to charge for accommodation ect.
Help Center
Quick Links
Services
Subscribe
Enter your email below to be the first to know
about new product launches.
Copyrights © 2023 EComposer. All Rights Reserved By Ecomelite




